BLB NRW Insights 2021

BLB NRW offers exciting Insights into the work in 2021 with a publication. We were involved in two projects shown.

At the underground mine in Mechernich, we inspected the 2.8 km long cable route of the east entrance, which supplies the tunnel system with water and electricity. (S. 12+13)

As a partner of SSP AG, we designed the supporting structure for the new building of the RWTH machine tool laboratory WZL (p. 36 ff).

Einblicke 2021 BLB NRW